{"id":375,"date":"2026-11-16T14:27:55","date_gmt":"2026-11-16T14:27:55","guid":{"rendered":"https:\/\/chavadagroup.com\/index.php\/product\/modular-steel-scaffolding-system-specification-to-enquiry\/"},"modified":"2026-11-16T17:04:10","modified_gmt":"2026-11-16T17:04:10","slug":"modular-steel-scaffolding-system-specification-to-enquiry","status":"publish","type":"product","link":"http:\/\/chavadagroup.com\/index.php\/product\/modular-steel-scaffolding-system-specification-to-enquiry\/","title":{"rendered":"Modular Steel Scaffolding System \u2013 Specification to Enquiry"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Modular steel scaffolding systems provide temporary access and working platforms for construction, maintenance and industrial projects. The system configuration must be designed for the intended duty, geometry and site conditions.<\/p>\n<h2 class=\"wp-block-heading\">Project details to confirm<\/h2>\n<ul class=\"wp-block-list\"><li>System type and compatible manufacturer components<\/li><li>Required working height, bay length and lift height<\/li><li>Duty\/loading class and intended use<\/li><li>Standards and design basis required by the project<\/li><li>Base plates, adjustable jacks, ledgers, transoms and braces<\/li><li>Platforms, access ladders, guardrails and toe boards<\/li><li>Anchorage\/tie arrangement, foundation and ground conditions<\/li><li>Inspection, handover and documentation requirements<\/li><\/ul>\n<p class=\"wp-block-paragraph\"><strong>Important:<\/strong> Scaffolding must be designed, erected, inspected and used by competent persons in accordance with applicable regulations and the system manufacturer&#8217;s instructions. This enquiry listing is not a design or load certification.<\/p>\n<p class=\"wp-block-paragraph\">Contact Chavada Limited with the access requirement or bill of materials for quotation.<\/p>","protected":false},"excerpt":{"rendered":"<p>Modular steel scaffolding system for access and temporary works. System type, bay dimensions, duty class, platform arrangement, tie pattern and applicable standard are confirmed to project requirements.<\/p>\n","protected":false},"featured_media":473,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[37,36],"product_tag":[],"class_list":["post-375","product","type-product","status-publish","has-post-thumbnail","product_cat-scaffolding-systems","product_cat-scaffolding-cranes-lifting-equipment","first","instock","shipping-taxable","product-type-simple"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/product\/375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/product"}],"about":[{"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/comments?post=375"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/media\/473"}],"wp:attachment":[{"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/media?parent=375"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/product_brand?post=375"},{"taxonomy":"product_cat","embeddable":true,"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/product_cat?post=375"},{"taxonomy":"product_tag","embeddable":true,"href":"http:\/\/chavadagroup.com\/index.php\/wp-json\/wp\/v2\/product_tag?post=375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}